Aldous D, Shepp L (1987) The least variable phase type distribution is Erlang. Comm. Statist.: Stochastic Models 3(3):467-473.
Alfredsson P, Verrijdt J (1999) Modeling emergency supply flexibility in a two-echelon inventory system. Management Sci. 45(10):1416-1431.
Artalejo JR, Gómez-Corral A, He QM (2010) Markovian arrivals in stochastic modelling: A survey and some new results. SORT: Statist. Oper. Res. Trans. 34(2):101-156.
Arts J, Van Vuuren M, Kiesmüller GP (2011) Efficient optimization of the dual index policy using Markov chains. IIE Trans. 43(8):604-620.
Basten RJI, Van Houtum GJ (2014) System-oriented inventory models for spare parts. Surveys Oper Res. Management Sci. 19(1):34-55.
Feng Q, Sethi SP, Yan H, Zhang H (2006) Are base-stock policies opti-mal in inventory problems with multiple delivery modes? Oper Res. 54(4):801-807.
Fischer W, Meier-Hellstern K (1992) The Markov-modulated Poisson pro-cess (MMPP) cookbook. Performance Eval. 18(2):149-171.
Fukuda Y (1964) Optimal policies for the inventory problem with nego-tiable leadtime. Management Sci. 10(4):690-708.
Gaukler GM, Özer Ö, Hausman WH (2008) Order progress information: Improved dynamic emergency ordering policies. Production Oper Management 17(6)599-613.
Koole G (1998) Structural results for the control of queueing systems using event-based dynamic programming. Queueing Systems 30(3):323-339.
Koole G (2004) Convexity in tandem queues. Probab. Engrg. Informational Sci. 18(1):13-31.
Koole G (2006) Monotonicity in Markov reward and decision chains: Theory and applications. Foundations Trends in Stochastic Systems 1(1):1-76.
Kulkarni VG (1999) Modeling, Analysis, Design, and Control of Stochastic Systems (Springer, New York).
Minner S (2003) Multiple supplier inventory models in supply chain management: A review. Internat. J. Production Econom. 81-82:265-279.
Moinzadeh K, Schmidt CP (1991) An (S-1, S) inventory system with emergency orders. Oper. Res. 39(3):308-321.
Muckstadt JA (2005) Analysis and Algorithms for Service Part Supply Chains (Springer, Berlin).
Pérès F, Grenouilleau JC (2002) Initial spare parts supply of an orbital system. Aircraft Engrg. Aerospace Tech. 74(3):252-262.
Puterman ML (1994) Markov Decision Processes: Discrete Stochastic Dynamic Programming (John Wiley & Sons, New York).
Ross SM (1996) Stochastic Processes, 2nd ed. (John Wiley & sons, New York).
Rustenburg WD, van Houtum GJ, Zijm WHM (2001) Spare parts man-agement at complex technology-based organizations: An agenda for research. Internat. J. Production Econom. 71(1-3):177-193.
Sheopuri A, Janakiraman G, Seshadri S (2010) New policies for the stochastic inventory control problem with two supply sources. Oper. Res. 58(3):734-745.
Sherbrooke CC (1968) METRIC: A multiechelon technique for recover-able item control. Oper. Res. 16(1):122-141.
Sherbrooke CC (2004) Optimal Inventory Modeling of Systems: Multiech-elon Techniques, 2nd ed. (Wiley, Hoboken, NJ).
Slay FM, Sherbrooke C (1988) The nature of the aircraft component fail-ure process. Technical Report IR701R1, Logistics Management Institute, Washington D.C.
Song JS, Zipkin P (1993) Inventory control in a fluctuating demand envi-ronment. Oper. Res. 41(2):351-370.
Song JS, Zipkin P (2009) Inventories with multiple supply sources and networks of queues with overflow bypasses. Management Sci. 55(3): 362-372.
Veeraraghavan S, Scheller-Wolf A (2008) Now or later: A simple policy for effective dual sourcing in capacitated systems. Oper. Res. 56(4): 850-864.
Verrijdt J, Adan I, de Kok T (1998) A trade off between emergency repair and inventory investment. IIE Trans. 30(2):119-132.
Whittmore AS, Saunders SC (1977) Optimal inventory under stochastic demand with two supply options. SIAM J. Appl. Math. 32(2): 293-305.
Zipkin PH (2000) Foundations of Inventory Management (McGraw-Hill, New York).